POND PUMP AND FILTRATION CENTRE BUILDINGS

General Info : In the centre of Ashgabat city, groups of pond filtration and transfer pumps, pump room of 8 involving supply of materials and installation of the mechanical installation works which is covered by Olympic village Project, According to Project; Galvanized Steel up to DN 800 HDPE project of installations consisting of steel manufacturing was manufactured in Turkey, which was transfered and established punctually after Steel production was done hot-dip galvanized.
Location : Ashagabat – Turkmenistan
Description : Internal and External Electro–Mechanical Works
Client : Polimeks A.S.
Construction Area : 3.370 sqm
Contract Date : 17.05.2013
Contract Period : 8 months
Delivery Date : 21.01.2014