General Info | : | The complex including the office, shopping center, ministry offices are composed of two blocks and the connection blocks between blocks as a part of Ashgabat Olympics Complex in Turkmenistan, Ashgabat.
All mechanical installation system of the Complex such as heating, cooling, air conditioning, plumbing, fire, fume and compression systems, installation and material supply are completed under obligation of Waterfall Engineering. |
Location | : | Ashgabat / Turkmenistan |
Description | : | Internal and External Electro–Mechanical Works |
Client | : | Polimeks A.S. |
Construction Area | : | 30.000 sqm |
Contract Date | : | 28.08.2012 |
Contract Period | : | 10 months |
Delivery Date | : | 11.12.2013 |